FUTURE PLANS

HUTTI MINE

  1. Deepening of the existing shafts and associated work like Coarse ore bin, crusher chamber, fine ore bin, belt conveyor and measuring flask will be installed in Hutti Mine.
  2. Underground Exploration by Diamond Drilling and Primary Development from 24th Level to 30th Level to establish depth persistence of ore body.
  3. Detailed exploratory mining at Hutti South Block
  4. Detailed Surface exploratory by Diamond Drilling at Hutti North (Northern portion of major Dyke)
  5. Development of Main Reef (Main Mine)
  6. Development of Grey's Shaft
  7. Development of Hutti New East Reef
  8. Exploration by Surface & Underground Diamond Drilling to identify the resource along the strike direction as well as depth continuity at Hutti Mine.
  9. A new mineral beneficiation plant (Sag and Ball Mill) for treating 2000 tonnes per day is in erection stage. And likely to be commissioned by May 2009.
  10. The present ore reserves at Hutti Mines up to 2000 feet level would be exhausting by the year 2011. HGML is already developing the depths between 2000 feet and 2600 feet which will be the second phase of the expansion and modernization programme. Further development below ground between 2600 feet level and 3000 feet is already envisaged and preparations are on. This expansion and modernization will further sustain the life of the mine.
  11. Implementation of Enterprise Resource Planning (ERP)